![]() It also is considered by many to be bloated, more than double the combined military budgets of China and Russia-and more than triple, if major US allies are added to the balance. It accounts for more than half of federal “discretionary” spending-spending that is the subject of the annual budget process. The defense budget is an obvious place to look. The huge US federal budget deficit, the need to mitigate the economic distress of many US workers, businesses, and state and local governments in the wake of the cononavirus epidemic, and other budgetary priorities-including climate change mitigation and infrastructure modernization-will inevitably stimulate a search for offsetting savings in forthcoming federal budgets. This piece lays out those arguments in detail and points out that, if Congress is unable to make a decision on eliminating US ICBMs in the next few years, the life of the Minuteman IIIs could be extended to 2060 at a much lower cost than the new ICBM, which is designed to last until 2080.īudgetary constraints. There are strong arguments to be made against the new ICBMs, however, on the basis of their cost, their vulnerability, and the contribution of their launch-on-warning posture to the danger of accidental nuclear war. 32) to the House version of the National Defense Authorization Act for Fiscal Year 2020 that called for a new study to examine the possibility of the alternative of extending the life of the Minuteman III again, as has already been done once in the 2000s. The resulting potent lobbying coalition was able to block a proposed amendent (No. Yellow circles show the locations of the 150 Minuteman III silos and 15 launch-control centers associated with Malstrom Air Force Base, Montana. ![]() “Aerojet Rocketdyne, Bechtel, Clark Construction, Collins Aerospace, General Dynamics, HDT Global, Honeywell, Kratos Defense and Security Solutions, 元Harris, Lockheed Martin, Textron Systems, as well as hundreds of small and medium-sized companies from across the defense, engineering, and construction industries.”įigure 1. Its press release states that the work will be carried out in Utah, Alabama, Colorado, Nebraska, California, Arizona, Maryand, and “at our nationwide team locations across the country.” The “team” of subcontractors includes: Northrup Grumman has spread the work over many states and congressional districts. The Air Force estimates the project’s capital cost will run to over $100 billion, while the Congressional Budget Office estimates that the total cost, including 30 years of operations, will be $150 billion. In September 2020, the Air Force awarded a $13.3 billion sole-source contract to Northrup Grumman for the weapon system design. The missiles were originally deployed during the 1970s.ĭuring the Obama administration, the Defense Department launched the Ground Based Strategic Deterrent program to replace these ICBMs with an equal number of new missiles, plus spare and test missiles, for a total of 642. ![]() The United States has 400 Minuteman III intercontinental ballistic missiles (ICBMs) suspended in reinforced concrete underground missile silos, plus an additional 50 empty silos, spaced about 10 kilometers apart near Air Force bases in Montana, North Dakota, and Wyoming (Figure 1).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |